Here are some facts that should be public. Anything different is not accurate information.
Property classifications and street addresses are from the tax assessment rolls.
The current coverage area makes service available to about 40 households (see map and property addresses linked below). Of those, 13 households have subscribed so far.
https://batchgeo.com/map/2e127b0f67e4504ffeac3dc755c59add
A second pole has already been installed further west up Garnet Lake Road. Electrical and equipment will be installed through July, by multiple contractors and National Grid, depending on their schedules.
https://batchgeo.com/map/2e127b0f67e4504ffeac3dc755c59add
A second pole has already been installed further west up Garnet Lake Road. Electrical and equipment will be installed through July, by multiple contractors and National Grid, depending on their schedules.
This will make service available to another dozen or so households in that area.
Two more poles are scheduled to be installed on Monday 22 June. Electrical and equipment will be installed through this summer, by multiple contractors and National Grid, depending on their schedules.
This will make service available to about 40 households available in those coverage areas (see map and property addresses linked below).
https://batchgeo.com/map/400a52d92b9e4dd5aa6e9160989be017
Two more poles are scheduled to be installed on Monday 22 June. Electrical and equipment will be installed through this summer, by multiple contractors and National Grid, depending on their schedules.
This will make service available to about 40 households available in those coverage areas (see map and property addresses linked below).
https://batchgeo.com/map/400a52d92b9e4dd5aa6e9160989be017